Over the careful planning and studies carried out, we outline improvements around Penang Hill. These will not only restructure the image, but also build a whole new experience for the tourist's hot spot.
Sky Walk & Lift
Penang Hill icon that provides easy access to KBB Bungalow for the elderly people and OKU to enjoy the extended deck.
View Decks & Gardens
Newly constructed view decks cover the 180-degree spectacular view of George Town and surrounding areas.
Holding Area
Extension of the Upper Station holding area for tourists convenience
Over the years, Penang Hill has completed a series of improvement activities. These activities resulted in transforming Penang Hill into one of today's hot spots in northern Malaysia.
LED Lightings at Lower Station (Viaduct Walkway)
To beautify the Viaduct Walkway at lower station especially during night time
ByPath A, B, C, D
Upgraded the walking trails on Penang Hill to provide more pleasure and a safer environment for the visitors and hikers.
Toilet Upgrades at Middle Station
Upgraded the toilet facilities in Middle Station for the hikers
Retracbtable Roof Canopy (Phase 1)
Upgraded the lower station with more sitting area (planter box) and Retractable Roof
Lightings along the track
Installation of Light poles and Spotlight along the track
Landscape along the Summit Road at Upper Station
Beautified the Summit Road with various plants and trees. Giving pleasure to the visitors who walk along the road.
Built Viewing Deck & SkyWalk at Upper Station
Upgraded heritage walkway from Lower Station to Middle Station
Upgraded landscape along the walkway near to clinic at Upper Station
LED Signage
Installed an LED signage at the Air Itam roundabout
Upgraded Septic Tank
Upgraded the CST B (Sewerage System at Upper Station)
Covered Walkway
Upgraded the walkway with covered roof from Lower Station to On-Grid Park
Viewing Deck and SkyWalk at Upper Station
Built Viewing Deck and SkyWalk at Upper Station for visitors to enjoy the beautiful scene from Penang Hill
Heritage Walkway from Lower Station to Middle Station
Upgraded heritage walkway and create a more comfortable path for residents, workers and hikers
Upgraded landscape along walkway next to the clinic at Upper Station
Beautified the walkway next to the clinic with more plants that suit the hill
Holding Area
For the convenience of the funicular users, the holding area space was upgraded. The visitors will no longer worry about the hot weather
New office at Multi-storey Car Park
The new office is located at the highest level of the PBBPP building
Refurbished Hillside Bungalow
Upgraded one of the heritage bungalows on Penang Hill
Refurbish PHC Guest House and Tulip House
These two houses were refurbished so that the staff of Penang Hill can enjoy the scenery and view of Penang Hill by staying up there.
New roof at Lower Station Turnstile
The POS ticketing system that was implemented at Penang Hill Station requires a covered to the visitors’ comfort when exiting the funicular.
ByPath E, F, G, H, I, J
Upgraded the walking trails on Penang Hill to provide more pleasure and a safer environment for visitors and hikers.
The Little Village (Supported Project)
The surrounding area of The Little Village is designed to replicate the dwarf’s houses. The main attraction here is the bees and visitors can also purchase the honey that is sold here.
Earthquake and Typhoon Pavilion (Supported Project)
Beautified the walkway next to the clinic with more plants that suit the hill
Road Upgrades
Road upgrades along the way at Jalan Upper Tunnel
Date: 04/04/2017 - 21/08/2017
Toilet Upgrades
The toilet upgrades at Jalan Tuanku Yahya Petra, Penang Hill.
Date: 07/08/2017 - 02/10/2017
Playground Upgrades
Upgraded playground and create a more comfortable and safety playground for visitors
Date: 16/10/2017 - 11/12/2017
Location: In front of Hindu Temple Penang Hill
Repaired Drains at Upper Station
Date: 10/07/2018 - 09/02/2019
Location: Along the way of Jalan Tunku Yahya Petra
Slopes stabilisation surrounding Middle Station of Penang Hill
Date: 11/09/2018 - 11/02/2019
Location: Middle Station Penang Hill
Slopes stabilisation surrounding Bel Retiro, Hindu Temple and Mosque Penang Hill
Date: 11/09/2018 - 11/05/2019
Location: Upper Station Penang Hill
Slopes stabilisation on Upper Tunnel Road (Edgecliff Bungalow, KBB Bungalow, Funicular Road Tunnel Area and PHC Guest House)
Date: 12/09/2018 - 11/09/2019
Location: near Methodist Centre
Repaired Drains at Upper Tunnel Road
Date: 29/10/2018 - 24/12/2018
Location: Upper Tunnel Road near to Rockies Bungalow
Repaired Drains from Tree Top Bungalow to Lower Tunnel Road
Date: 29/10/2018 - 24/12/2018
Location: Upper Tunnel Road near to Tree Top Bungalow
Repaired Upper Tunnel Road
Date: 29/10/2018 - 24/12/2018
Location: Upper Tunnel Road
Repaired wall along Viaduct East Road, Penang Hill
Date: 29/10/2018 - 26/11/2018
Location: Along Viaduct Road
Built wall at upslope in front of Earthquake Pavilion
Date: 29/10/2018 - 26/11/2018
Location: Facing Earthquake Pavilion
Repaired ByPath I and ByPath J
Date: 29/10/2018 - 24/12/2019
Location: ByPath I at Upper Tunnel road, ByPath J at Viaduct Road
Slopes repairs at ByPath A (Upslope)
Date: 29/10/2018 - 24/12/2018
Location: At Jalan Tunku Yahya Petra near ByPath A
Road repairs at Waterfall Road
Date: 29/10/2018 - 24/12/2018
Location: Next to Earthquake Pavilion
Slopes repairs at Viaduct West
Date: 12/11/2018 - 07/01/2019
Location: Road next to Methodist Center
Built Penang Hill Nursery
Date: 13/02/2019 - 11/05/2019
Location: In front of ByPath D
Slopes stabilisation at Upslope and Downslope of Viaduct West, Penang Hill
Date: 12/08/2019 - 13/03/2020
Location: Upper Station
Repaired slopes at Viaduct Road East and West
Date: 21/08/2019 - 13/11/2020
Location: Along Viaduct Road (CH850 - CH1200)
Design and installation of rock netting and fencing along the railway track
Date: 17/09/2019 - 28/12/2020
Location: Along railway track
Slope stabilisation surrounding Upper Station
Date: 17/09/2019 - 29/05/2020
Location: Upper Station
Repaired road in front of Edgecliff Bungalow to Waterfall road
Date: 21/08/2019 - 13/11/2019
Location: from Waterfall road to Edgecliff Bungalow
Slope stabilisation surrounding Edgecliff Bungalow
Date: 28/10/2019- 27/02/2020
Location: Edgecliff Bungalow at Upper Tunnel Road
Upgrades and repairs of monsoon drains from Viaduct Road West to Claremont
Date: 11/06/2020 - 03/09/2020
Location: Starting from Jalan Tunku Yahya Petra next to Viewing Deck to Upper Tunnel Road which next to Bungalow Tree Top
Repaired damage drains
Date: 06/08/2020 - 16/09/2020
Location: Starting from Jalan Tunku Yahya Petra to Upper Tunnel road
Slopes stablelisation at CH1700-1750 AND CH1850-1950 of Viaduct West, Penang Hill (In Progress)
Date: 05/08/2020 - 06/02/2021
Location: Viaduct Road West
Reparing ByPath F, G & Heritage routes at Penang Hill (In Progress)
Date: 14/09/2020 - 07/12/2020
Location: Upper Tunnel road
04-828 8880
04-828 8862
Tingkat 7, Bangunan Perbadanan Bukit Bendera Pulau Pinang, Jalan Stesen Bukit Bendera, 11500 Ayer Itam, Pulau Pinang